| Fiscal Year 2007-2008 |
| Services Offered |
Fees * |
| Agar-enrobing cells - Includes technician time |
$11.25/sample |
| Excising tissue out of paraffin block & deparaffinizing |
$22.50/block |
| Tissue Preparation – TEM |
$92.00/different vial |
| Sectioning (Technician Time) |
$45.00/hr |
| TEM Beam Time |
$58.00/hr |
| TEM Exposures |
$3.00/plate |
| |
| Negative Staining/Viral ID – Includes Tech time + Scope time |
$44.50/sample |
| Differential Centrifugation – Includes Tech time + Scope time |
$53.00/sample |
| Homogenizing/Airfuging – Includes Tech time + Scope time |
$52.50/sample |
| ImmunoElectron Microscopy – Includes Tech time + Scope time |
$46.00/sample |
| (Investigator usually provides convalescent sera) |
|
| |
|
| Tissue Preparation – SEM (Fix, dehydration, CPD, mount, coat) |
$98.50/sample |
| Critical Point Drying – Tech time+ |
$12.00/run |
| Sputter Coating - Tech time + |
$12.00/run |
| SEM Beam Time |
$58.00/hr |
| Thermal Prints |
$.42/print |
| |
| Immunocytochemistry – Tech time + |
$4.25/grid |
| (Investigator provides blocking sera, antibodies, & gold conjugates) |
|
| Immunocytochemistry – Tech time + |
$9.00/grid |
| (If EM Lab provides any of the blocking sera or gold conjugates) |
|
| |
| Vacuum evaporation/shadowing/carbon-coating – Tech time + |
$12.00/run |
| Carbon-coated, formvar grids or Parlodian grids |
$2.75/grid |
| SEM Specimen Stubs |
$0.35/each |
| Carbon Adhesive Tabs |
$0.25/each |
| Grid box |
$14.00 each |
| 25% glutaraldehyde (EM Grade) |
$8.50/ampoule |
| Nerve biopsy fixative – 2.5% glutaraldehyde in buffer |
$14.00/50 ml container |
| Glass slides |
$.28/slide |
| CD-R (used for copying images) |
$1.15/each |
| Regular copper or nickel grids |
$1.00 each |
| High transmission nickel grids |
$1.50 each |
*Fees are proposed for all the following facilities:
- UGA System / Federal Facilities: includes Russell Research and SEPRL
- Non-GA Academic & State Facilities includes universities outside the UGA System and all practicing veterinary clinics. Note: Partial payment will be required before the project begins.
|
| All Commercial facilities will be presented with a separate fee schedule upon request. Commercial facilities include companies and research laboratories. |